I have just spent the last few days needing to drive back and forwards to newcastle more than once a day. The battery top ups required are achievable now that we have a 32 amp charging post in the carpark beside the office. It's achievable that is as long as I am the only one using the post. As soon as Ged2 appears for his top up we will both have a timing problem. So the qualification is that I can manage relatively high daily mileages at the minute but probably only because I have a virtually dedicated network at my disposal.
In terms of charging point chats ( this is replacing the "water cooler") I had an interesting 10 minute discussion yesterday with someone I know that quickly moved from electric cars , to battery storage in general to his own detailed need for an energy efficient flood lighting system all stemming from a little blue car with a wire stuck in its nose.
Subscribe to:
Post Comments (Atom)
Blog Archive
-
▼
2012
(30)
-
▼
May
(13)
- Charging between points
- multi coloured swap shop
- quick charge in Thornaby - a building site near a ...
- Back to basics
- Kathleen Ferrier knows of what she sings
- finding a mate
- Nothing comes from nothing, nothing ever could
- serendipity
- time to talk
- highly charged
- my left foot My first proper drive in the electric...
- To infinity and beyond
- Feeding time
-
▼
May
(13)
No comments:
Post a Comment